Day 127
Miscellaneous
Reassembled the brake throttle quadrant. It looks so great took a little work to get the brake cylinder to adjust properly.
Also reinstalled the upper control sticks and hooked up the pushrods. These also look awesome. Took care to again keep all the controls moving smoothly as more parts were added.
Finished the nose wheel spat. That took a little bit of work because everything had to be measured to find the holes for the brackets.
Lastly we placed and riveted the underside skin that covers the main landing gear, now that we had replaced the strengthening spacers. This was Cleco’ed on first, then drilled the holes. Working from the center outwards we then riveted the panel in place.