Tyler's Sling TSi

Day 157

Heater Box

Measured, cut and installed 8 vent hoses for the heater ductwork. They took a little work to get them all to route and fit where they needed to go. Especially with the extra wide avionics shelf. The hoses and vents just barely fit on either side. Got them in there though, and extra secured with a couple of cable ties holding the “Y’s” in place.

Just about have the wiring figured out for the heater. We’ll also be able to fit the dial cables.